Below are cost and schedule summaries of recently completed projects, which are broken into different project types for easy navigation. The intent of publishing these estimates is to provide end users with project costs so that they can properly plan and budget for projects of similar scope. All projects are unique, and projects in older buildings tend to have higher costs due to the poor infrastructure of the building. A 10%-20% contingency is recommended on all renovation projects to account for unforeseen conditions and unanticipated scope requirements.
2024
Access Control / Security / Safety
- 23020001 Biology Room 301 Panic Button
- 23075004-FO NSCM Loading Dock ADA Operator Installation
- 23090002-FO Health Sciences II Room 115 Door Modification and Access Control
- 23115001 Academic Villages POD Convenience Store – Add Security Cameras
- 24091002 Engineering 2 Room 304 Access Control
- 24099001-FO Psychology Smoke Control System Upgrade
- 24906003 CMB Third Floor Access Control
- 24GRP004 Towers 1 and 2 Security Camera Upgrade
ADA Studies
- 23ADA001 B0079, B0040, B0075 General Purpose Classrooms ADA Survey
- 24811101 Partnership 1 Room 224 ADA Plan for Occupancy Capacity Increase
Deferred Maintenance / HVAC
- 19150002 Public Safety Building Computer Room HVAC Replacements
- 20032001 Seminole Hall Ventilation Upgrade
- 21100201 College of Medicine Boiler System Replacement
- 21150001 Public Safety Building Chiller Replacement
- 21903002 Rosen Chilled Water Pipe Repair
- 22040005 Engineering 1 AHU Replacement
Electrical
- 22051002 Visual Arts Replacement of MDP in Electrical Room 162
- 22116002 HEC Room 101 Multimedia
- 23001005 Millican Hall Relocate Cubicles From Room 282 to 120
- 23006001-FO Theater Addition of 208V Outlets for Spotlights
- 23021003 Educational Complex and Gym Room 174A Electrical
- 23082004 John Euliano Park Installation of Pitch Clocks
- 23116001 L3Harris Engineering Center Renovate Room 401
- 23123001-FO TCH Room 215 Interactive Display Installation for Transfer Connect Center
- 23194001 Florida Solar Energy Center Rooms 101 and 104 25A 208V 3P Circuit for Power Supply
- 23915003 DPAC Room 403G Multimedia Upgrade
- 24016A01-FO Facilities and Safety Install Fleet Vehicle Charging Station
- 24021001 Education Complex Room 174A Remove Crestron System
- 24050008 Arena Section 112 Add Circuits and Outlets
- 24053001-FO CREOL Addition of 120V Outlet for Computer
- 24079001 Classroom Building 1 Install Multimedia in Student Study and Collaboration Areas
- 24120003 Research 1 Room 224 Electrical Modification for Vacuum Pump
Exteriors
- 20032002 Seminole Hall Stairwell
- 22088001 RWC Turf Field Replacement
- 23360001 Reflecting Pond Repairs, Sealing, and Training
- 23GRP003 Garages Fall Protection B0131(G), B0134(E), B0141(F), B0160(Libra)
- 24360001-FO Reflecting Pond Concrete Repairs and Resurfacing
- 24EXT004 Stormwater Line Repair From Spectrum Bore-Through
- 24EXT006 RWC Pickleball Courts
Fire Alarm
- 22021002 Educational Complex Fire Alarm Replacement
- 22132001 Tower 3 Fire Alarm System Upgrades
- 22133001 Tower 4 Fire Alarm System Upgrades
- 23904001 Rosen Housing Fire Alarm Upgrades
- 24054001 College of Sciences Suite 231 Install Fire Alarm Enunciator
- 24088001 RWC Fire Alarm and Device Replacement
- 24011001 Polk Hall Fire Alarm Replacement
- 24126002 Fairwinds FACP and Device Replacement
- 24132001 Tower 3 SNAC Panel Installation
Interiors
- 22016A01 Building Department Renovation
- 22045001 BA1 CYBER Suite 136 Renovation
- 22079003 Classroom Building 1 Rooms 305, 306, 306A Renovation
- 23027001 CAPS Paint and Carpet Interior
- 24002004 Library Rooms 120, 136, 155,155C, and 230 Carpet and Paint
- 24087001 CAH RM 191A Addition of Door, Move Existing Furniture, Data, and Electrical
- 24091001 Engineering 2 Room 418 Video Wall Height Correction
- 24811802 University Tower Room 150A Overhead Safety Harness and Renovate Finishes
- 24915001 DPAC Room 151 Conversion of Classroom to Campus Store
Plumbing
- 23050014 Arena Connect Water Device to Water Line
- 24GRP002-FO B0129, B0130, B0132, B0133 Towers Shower Stall Repair-Replacement
Roads / Parking / Sidewalks
- 23CWP001 ADA Parking Space Striping and Access Upgrades
- 23EXT004-FO Add 18 Metal Sign Poles in Asphalted C3 Lot at Student Health Center Spaces
Tech Fee
2023
Access Control / Security / Safety
- 21001003 Third Floor Suite Access Control Elevator AC Call Box
- 22014001 HPH Rooms 113 & 114 Access Control
- 22915002 DPAC Access Control and Magnetic Hold Open Integration
- Toe N Go Elevator Foot Controls
- 23012001 Math Sciences Add Access Control
- 23014001-FO Howard Phillips Hall Install Trakabox in Room 403
- 23079001 Classroom Building 1 Install Key Card Access
- 23093001 Teaching Academy Install Key Card Access Control
- 23160002 Libra Garage Install Security Cameras
- 23CWP002 Campus Wide Elevator Door Lock Monitoring (E&G)
- 23CWP004 Campus Wide Elevator Door Lock Monitoring (Housing)
Deferred Maintenance / HVAC
- 17027003 CAPS HVAC Controls System
- 17045005 BA1 Replace HVAC Control System
- 17054003 College of Sciences HVAC Control System
- 19001004 Millican Hall BAS and HVAC Modernization
- 20048002 Lab and Environmental Support Room 102 Addition of a DX HVAC Unit
- 21123002 TCH Office Renovation and TR541 Trailer Removal
- 22002004 Library Penthouse AHU Refurbishment
- 22024004 Creative School HVAC Replacement
- 22051001 Visual Arts Air Quality Improvement
- 22052007 Student Union HVAC Deficiency Repairs
- 22073001 Housing Administration HVAC Upgrade
- 22079001 Classroom Building 1 Air Quality Improvement
- 22088002 RWC AC Unit Replacement
- 22090001 Health Sciences 2 Room 238 Furniture, Power, and Data
- 22109002 Nike 109 Telecom Closet Upgrade
- 22110002 Nike 110 Telecom Closet Upgrade
- 22111001 Nike 111 Telecom Closet Upgrade
- 22113001 Nike 113 Telecom Closet Upgrade
- 22904001 Rosen Housing 1 Telecom Cloest Rooms 207 and 407 Upgrade
- 22905001 Rosen Housing 2 Telecom Cloest Rooms 207 and 407 Upgrade
- 23007A01 Ferrell Commons 7A Relocate Network Telecom Room Power and Sleeves
- 23007B01 Ferrell Commons 7B Room 133F Relocate Network Telecom Room Power and Sleeves
- 23007C01 Ferrell Commons 7C Relocate Network Telecom Room Power and Sleeves
- 23007E01 HVAC, Power and Sleeves Upgrade for Network Telecom Room
- 23007F01 Ferrell Commons 7F HVAC, Network Telecom Power and Sleeves Upgrade
- 23007G01 Ferrell Commons 7G Network Telecom Power and Sleeves Upgrade
- 23028001 Creative School II UV Lights
- 23091002 Engineering 2 Room 435 Fume Hood Replacement
Electrical
- 21006002 Theatre Electrical Panel Replacement
- 21044001 SEC Electrical Connection for Haas CNC Machine
- 21121005 Physical Sciences Relocate Electromagent from Room 108 to Room 116
- 21135004 Football Stadium Gate Lighting
- 22001007 Millican Hall Room 303 President’s Office TV Mounting
- 22001008 Millican Hall Room 253 TV Wall Mount
- 22021001 Educational Complex Room 308J Multimedia Upgrade
- 22052002 Student Union Rooms 302 and 303 Add Power and Data for PC Gaming, and Access Control
- 22073002 Housing Admin Room 123 Reconfiguration
- 22080001 Health Sciences 1 Room 206 Multimedia Upgrade
- 22098002 Classroom Building 2 Telecom Closet Electrical Upgrade
- 22121005 GEM4 Cart Charging Outlet for Biology Department
- 22135003 Football Stadium Re-Brand
- 22135007 Football Stadium New Circuit for Sound System in Home Locker Room
- 22142004 Soccer Practice Field Power for Camera System
- 22906006 CMB ADA Stanchion Improvement
- 22915001 DPAC Power and Data for Library
- 23005002 Chemistry Room 106A Upgrade for Scientific Equipment
- 23308001 WUCF Antenna Tower Grounding Repairs
- 22308003 WUCF Tower Power Outlets Addition
- 23029001 Tech Commons 2 Data Mining Lab Electrical Upgrade 2
- 23075001 NSCM Install New Surround Sound Equipment
- 23075003 NSCM Conduit for IT Telecom Rooms Upgrade
- 23100101 Burnett Biomedical Sciences Electrical Modification for Existing Lab Equipment
- 23135005 Football Stadium Drone Detection System Antenna
- 23105001 LNCC Room 1350 AV System Upgrades
- 23812601 Partnership 3 Room 120 Electrical Upgrade to Support Digital Twin Effort
- 23EXT003 Audio Signaling for Visually Impaired Pedestrians at Crosswalks
Feasibility Studies
- 22100202 College of Medicine Rooms 321F and 416D HVAC Modification for Office Conversion
- 22812602 Partnership 3 Room 102 Block Chain Data Miners Feasibility Study
Fire Alarm
- 17150002 UPD Upgrade Campus Fire Alarm Monitoring System
- 22811905 Partnership II Fire Alarm and Device Upgrade
- 23010001 Osceola Hall Fire Alarm Replacement
- 23104001 Nike 104 and Nike 105 Replace Fire Alarm System
Interiors
- 18091005 Engineering 2 Room 418 Modifications for Smart Cities Lab
- 19123004 TCH Room 215 Space Reassignment UCF Abroad
- 20127002 Student Health Center Tile and Carpet Replacement
- 20917001 DTC Parking Garage Facilities Operations Office Build-out
- 21001002 Millican Hall Suites 341 and 396 UCER Space Remodel
- 21040001 Engineering 1 Room 468 Electrical and Rework Internet for Lab
- 22007003 Ferrell Commons 7F Room 185 Sound Reduction
- 22001002 Millican Hall Room 395E Conference Room Upgrade for Hybrid Conferencing
- 22080002 Health Sciences 1 Room 105 Remodeling
- 22100002 Burnett House Tile Replacement
- 22100003 Burnett House MDF Door Move
- 22121004 Physical Sciences Study Alcove Renovation
- 22121006 Physical Sciences All Gender Restroom
- 22123001 TCH Suite 133 Front Desk Reconfiguration
- 22150001 Public Safety Building Training Room 316 Updates
- 22815101 Partnership 4 Rooms 200, 226, and 227 Office and Lobby Remodel
- 22906007 CMB FIEA Office Painting and Room 137 Tile and Cabinet Upgrade
- 23007F02 Ferrell Commons 7F Testing Room Sound Reduction
- 23002001 Library Suite 512 Carpet Replacement
- 23002002 Library Vinyl-Carpet Replacement on 1st and 5th Floors
- 23021002-FO Educational Complex Rooms 115K, 223L, 322F Door, Window, and Room Improvements
- 23052006-FO Student Union Room 107A Blackstone Launchpad Window Glass Replacements
- 23054001-FO College of Sciences Common Area Carpet Replacement
- 23099002 Psychology Room 138 Curtain Installation
- 23811101-FO Partnership 1 Room 215 Infill Ceiling Void
- 23903001 Rosen Student Lounge Cabinets and Countertops Upgrade
Other
- 21051002 Visual Arts Construction of Exterior Storage Structure
- 22024001 Creative School 1 Playground Structure
- 22024002 Creative School 1 Shade Structures
- 22024003 Creative School Playground Fencing
- 22355004 North Cell Tower Security Fence and Gate
- 23024001 Creative School 1 Shade Structure #3
- 24004001-FO Storm Water Research Lab Envelope Repairs
Plumbing
Roads / Parking / Sidewalks
Tech Fee
- 19093004 Teaching Academy Rooms 202A, 202B, 222 Upgrade Multimedia
- 19123010 TCH Room 325 Tech Fee Digital Humanities Makerspace
- 21005001 Chemistry Room 203 Tech Fee Classroom Refresh
- 21021003 Education Room 190 Classroom Refresh
- 21094001 BA2 Rooms 201, 207, 208, 210 Tech Fee Classroom Refresh
- 21099001 Psychology Tech Fee Classroom Refresh
- 21812101 Orlando Tech Center Tech Fee Classroom Refresh
- 22139001 Global Building Upgrade Classroom Tech and Multimedia
Utility
2022
Access Control / Security / Safety
- 22014002 HPH Anthropology Traka Box Installation
- 22040002 Engineering 1 Rooms 456 and 474 Cameras
- 22053001 CREOL Room A106 Replace Door and Install Access Control
Deferred Maintenance / HVAC
- 19140001 Career Services BAS Replacement
- 21050001 Venue HVAC Reheat Revisions
- 22121001 Physical Sciences Room 249 Power and Ventilation for Instruments
Electrical
- 21120005 Research 1 Room 363 Electrical Modification for Furnaces
- 21154001 MAE-OM Lab Room 123 Electrical Modifications for Furnace Replacement
- 22050007 Addition Arena New Volleyball Lockers
- 22082002 John Euliano Park Repair Concrete Pillar Below Scoreboard
- 22120001 Research 1 Lab 160 Microgrid Test Bed
- 22121003 Physical Sciences Room 238 Power Outlet Upgrade
- 22128001 Nicholson Fieldhouse Field Camera
- 22135001 Spectrum Stadium Power for Speakers
- 22135009 Football Stadium Annual Cooler Power Upgrades
- 22140001 Career Services Room 121 Technology Upgrade
- 22350001 ESTB Generator Project
- 22813001 Bennett Building 4 Add Two 208V Outlets and Two 115V Outlets
Exterior Signage
- 20105004 Lake Nona Cancer Center Corner Signage
- 22050006 Addition Arena Room 4202 Remove Incorrect Military Signage at VARC
Fire Alarm
- 21111001 Hercules 111 Fire Alarm & MNS Upgrade
- 22009001 Lake Hall Fire Alarm Replacement
- 22102001 Nike 102 Fire Alarm Replacement
- 22902001 Ying Academic Center Fire Alarm System Replacement
Interiors
- 22001004 Millican Hall Suite 328 Carpet Replacement
- 22121007 Physical Sciences Room 318 Cabinet Replacement
- 22811903 Partnership 2 Room 234 Updates
- 22GRP001 Housing Interior Paint
Other
- 22026001 JT Washington Center Paint Building
- 22100301 Lake Nona College of Nursing Floor Plans
- 22109001 Hercules 109 Replace Stairwell Doors
- 2282A001 John Euliano Park Install Sound System
Plumbing
Research
Roads / Parking / Sidewalks
- 20012001 Math Sciences ADA Review and Upgrade of Entryways
- 23153001 Black Out Spaces to TV-Media Lot at Stadium North of B0165
Roof Repair / Replacement
Tech Fee
Utility
2017-2021
Access Control / Security / Safety
- 18014002 HPH Replace Exterior Doors and Hardware
- 18079002 OSM Replace Onity Access Control System
- 18116003 Access Control L3Harris Engineering Center
- 18815202 Partnership V Building Assessment and Security Enhancements
- 19003001 UB1 Add Access Control to Perimeter doors
- 19040001 ENG1 Security Cameras
- 19040005 Engineering I Loading Dock Door Access Control
- 19040006 Lab 260 Upgrade Eng I Access Control
- 19045001 Add Access Control At Business Administration I
- 19045002 Interior and Exterior Cameras BA 1
- 19045008 Business Administration I Fall Protection
- 19048001 Add Access Control to LES
- 19072001 UBII Add Access Control to Perimeter doors
- 19075003 NSCM Exterior Access Control
- 19075005 NSC Camera Installations
- 19075006 NSCM Access Control Upgrades
- 19079002 Classroom Building 1 Install Interior & Exterior Security Cameras
- 19079003 Add Interior Access Control To CB1
- 19090001 HSII Access Control for Exterior Door
- 19091001 Engineering II Security Cameras
- 19094001 Add access Control to BA II Exterior Doors
- 19094002 Install Interior and Exterior Security Cameras BA II
- 19091005 Electrify 2nd leaf of external doors at Engineering II
- 19094003 BA II Fall Protection
- 19096001 DEWC Security Cameras.pdf
- 19098001 Repair and Modify Perimeter Access Control at CB II
- 19121005 Install Keypad Reader Outside PSB122
- 19150003 PSB Lockdown Buttons
- 19903006 Rosen Fall Protection
- 19950001 LPR Cameras and Bluelights at Centroplex Garage I
- 19906008 CMB Access Control
- 20001001 Cashiers Office Alarm and Panic Button
- 20001004 Security Camera Installation Millican Hall
- 20005003 B0005 Chemistry Exterior Doors Access Control
- 20006001 Theatre Building Exterior Door Access Control
- 20007003 Add Security Ferrell Commons 7G
- 20012002 Mathematical Science Building Exterior Access Control.pdf
- 20014002 HPH Exterior Door Access Control
- 20020004 Biological Sciences Exterior Door Access Control
- 20021001 Educational Complex and Gym Exterior Access Control
- 20021002 Educational Complex Room 192 Access Control Door
- 20029001Tech Commons II Exterior Doors Access Control
- 20051003 Visual Arts Exterior Access Control
- 20075001 B0075 NSC Interior Access Control
- 20080001 Security Cameras at Health Sciences I
- 20080003 HS I Install Exterior Access Control
- 20089001 Replace Camera in Garage B
- 20090002 Health Sciences 2 Third Floor Security Cameras
- 20093001 Teaching Academy Exterior Door Access Control
- 20094002 BA II Installation of Duress Buttons
- 20095001 Burnett Honors College Exterior Door Access Control
- 20123002 Replace Bluelight Phone
- 21053001 CREOL Room A207 Access Control
- 20815202 Partnership 5 Army Security Office in Lobby
- 20119002 B0119 PAC Exterior Access Control
- 20150001 Police Department Communication Center Update
- 20CMP002 ConEx Cove
- 21100102 Burnett Biomedical Camera Additions
- 21304001 South Telecom Switch Building Generator Replacement
- 21960001 Unionwest Rooms 210, 213A, 213B Testing and Accessibility Improvements
Deferred Maintenance / HVAC
- 15ZN3006 Pegasus Circle – Redesign Curb and Inlet
- 18044001 HVAC Replacement at Siemens Energy Center
- 18077001 HVAC Upgrade of WDSC Telecom Switch Room
- 18101001 Nike 101 Replace Cooling Tower
- 18108001 Hercules 108 Replace Cooling Tower
- 18121003 Physical Sciences Relocate Fan Coils for Maintenance
- 18139003 Access Panel for Chilled Beam
- 19006002 Theatre HVAC Replacement
- 19044001 Air Compressor Replacement
- 19152001 AMPAC DX Unit and BAS Controls Replacement
- 19411002 Kappa Alpha Theta AHU #7 Redesign
- 20815101 HVAC Replacement Partnership IV
- 20072001 Replacement of Cooling Tower #8
- 20902001 Ying Academic Center HVAC Replacement
- 21020002 Biology TAF Mini Split Redundancy HVAC System
- 21100001 Burnett House HVAC Modifications
- 21100002 Burnett House HVAC and Controls for IT Room
- 21906003 CMB TRANE RTU Replacements
Electrical
- 17903006 Replace Cooking Equipment Rosen Room 125
- 18065002 Lake Claire Commons Room 114 HVAC Upgrade
- 18132001 Tower 3 Remove & Replace Meters
- 18137002 Replace Meters Knights Plaza
- 18304001 South Telecom Switch Room Upgrade HVAC
- 19005002 Replacement of MDP Chemistry
- 19016005 Facilities & Safety Bldg 16D BAS Upgrade
- 19020001 Design for Renovation of Biology Laboratories 108, 110 & 110A
- 19026002 Install Sync Modules at J.T. Washington Center
- 19032001 Seminole Hall Remove Generator and Install LED Light fixtures with Battery Backup
- 19045003 Add Power Data and Install Displays Room 107
- 19045006 Business Administration I Room 130
- 19052002 Relocate Projector and Add Cables
- 19052004 Power for Prestigious Awards Wall
- 19030001 Generator removal, and install of LED lighting and Elevator Emergency Recall at Brevard Hall
- 19093001 (1819-31) TA- 2nd Floor Alcove, 131- Add Electric
- 19135014 Football Stadium T-Mobile Addition to Existing DAS
- 19812604 Partnership 3 BAS Modernization
- 20001002 Millican Hall Room 120Y Student Financial Assistance Workroom
- 20029002 Tech Commons II Room 221A Data Mining Lab Upgrade
- 20040001 Electrical Modification for Oven ENG I Room 0176
- 20045007 BA 1 RM 136 Data and Power Upgrades for Multimedia
- 20811901 Install VR Dome Simulator at Partnership II
- 20915003 Electrical Upgrades for Multimedia in DPAC Rooms 210 and 320
- 20116004 L3Harris Center Room 203 Electrical & Mechanical Upgrades
- 20CWP005 Upgrade Power at LPR Locations
- 21090001 Health Sciences II Room 241 Install TV
- 21002002 Library Room 121 Install Outlets in Switch Room
- 21002003 Library Room 121 Install Power Receptacles in Switch Room
- 21021002 Wellness Research Center Room 179 Add Cooling Fans
- 21076001 Engine Research Lab Power Upgrade
- 21100103 Burnett Biomedical Electrical Upgrade to Comm Rooms TF1920-34
- 21120002 Research I Room 154 Install Outlet for NH Research Model 9430
- 21123001 B0123 CAHSA TCH Room 125 – Electrical and Data
- 21021001 Education Building Telecom Closets Upgrade
- 21026003 JT Washington Center Breezeway Fans
- 21077001 Wayne Densch Sports Center Install Back Light Letters
- 21090003 Health Sciences II Digital Kiosks for CHPS Student Advising
- 21080004 Health Sciences I Room 343A Electrical Modifications for Conference Room TV
- 21100204 College of Medicine Electrical Upgrade Comm Rooms TF 1920-34
- 21127001 Health Center Electrical Modification for 220 V Freezer
- 21127003 Health Center Room 303 Washer Dryer Installation
- 21304001 South Telecom Switch Building Generator Replacement
- 21304002 South Telecom Switch Building Decommission Old NFinity UPS System
- 21811901 Partnership II Business Center Door Removal Install Occupancy Sensor and Electrical Outlets
- 21812601 Partnership 3 Room 120 Electrical Modification for ARCC
- 21812604 Partnership 3 Network Upgrade
- 21815101 Partnership 4 Tech Grove Infrastructure Improvements
- 21906004 Communication and Media Building Room 178 Electrical Modification for Hood Device
- 21906005 CMB Electrical Upgrade of Comm Rooms
- 21915002 DPAC Room 330K Electrical and Data Modifications
- 21915002 DPAC Room 330K Electrical and Data Modifications
- 21915007 DPAC Room 155D Washer and Dryer Installation
- 22001001 Millican Hall Room 256 (AKA 243) Upgrade Conference Room Technology
- 22054002 Relocate Power From Room 337 to Room 304, Add Power to Room 107
- 22071001 Barbara Ying Center Conference Room Remodel
- 22081001 Barbara Ying Center-CMMS Room 107 Install Panic Button
- 22005001 Chemistry Room 218 Ethernet Port Installation
- 22050002 Arena Sign Power
- 21120001 Research I Preparations for Scienta Omicron HIPP Lab Room 128
- 21120004 Research 1 Vive Vue Building Space Utilization
- 21121002 Physical Sciences Electrical and Plumbing Upgrades Cryostat Labs 109 and 403
Exterior Signage
- 14020014 Biological Sciences Exterior Sign Relocation
- 15126001 Fairwinds Alumni Center Install Exterior Signage
- 17ZN2008 Install Three Monument Signs for Dixon Athletics Village
- 18075004 Add Exterior Signage to Nicholson School of Communication Building
- 21080002 Health Sciences I Update Exterior Signage to Reflect Name Change
- 21090002 Health Sciences II Update Exterior Signage to Reflect Name Change
- 21128001 Nicholson Field House Signage
- 21CWP003 Diversity and Inclusion Brick Feature Schematic Design
Feasibility Studies
Fire Alarm
- 15045002 Business Admin I Replace Fire Alarm System
- 15075002 NSCM Upgrade Fire Alarm and Mass Notification
- 19079008 CB1 Fire Alarm
- 20012003 Math Sciences Fire Alarm Panel Replacement.
- 20090001 Health Sciences II Fire Alarm Replacement
- 20150002 Public Safety Building Fire Alarm Replacement
- 20906005 CMB Fire Alarm System Replacement
- 21008001 Volusia Hall Fire Alarm Upgrade
- 21052001 Student Union Fire Alarm Strobe Synchronization
- 21103001 Nike 103 Fire Alarm Upgrade
- 21129001 Tower 1 Fire Panel System Replacement
Interiors
- 14007004 Ferrell Commons Office Renovation
- 14099008 Psychology Acoustic Panels
- 15006000 Black Box ADA Theatre Upgrades
- 15016008 UES Office Renovation
- 15052014 Student Union Office Renovation
- 17012007 Create New MALL Lab and 2 Breakout Rooms
- 17033001 Libra Community Center
- 17075004 Replace Auditorium Carpet and Seating
- 17950002 Renovation of Centroplex I for UCF PD Downtown
- 18007003 Replace Carpet and Window Treatments
- 18026002 JT Washington Center Retail Space Enhancements
- 18120003 Build-out of Research I Lab 326
- 19001005 Replace Carpet In Presidents Suite
- 19012003 MSB Carpet Replacement
- 19021008 Education Building Room 120 Upgrade for Grad Students
- 19079001 Carpet Replacement CBI
- 19079006 Convert Classroom to VTC
- 19092001 Biology Field Research Center Specimen Storage, Growth Chamber, and Classroom Upgrades
- 19811902 Partnership II Carpet Replacement
- 20005002 Chemistry Room 218 Workspace Upgrades
- 20045003 Atrium Wainscoting BA I-1
- 20045004 Refresh BA1 Paint and Carpet
- 20079001 Classroom I Replace Seating in Rooms 104 & 121
- 20906011 Communication & Media Bldg Room 115A Refurbish FIEA
- 20099001 Site Preparation for Virtual Reality Equipment in PSY 204
- 20906003 CMB Restroom Renovations
- 20906008 Communication and Media Building Classroom Renovation
- 20105001 Lake Nona Cancer Center Demolition
- 20116002 HEC3 Carpet Replacement
- 20105002 Lake Nona Cancer Center Second Floor Restroom Addition
- 20120001 Modify Lab Infrastructure to Support Cilas Particle Analyzer
- 20123001 TCH Window Film
- 20127003 Health Center Glass Enclosures at Reception Desks
- 21001001 Millican Hall Room 390 Soundproof Walls
- 21029001 Tech Commons II Carpet Update for Statistics Rooms 207, 215, 218, 220, 221, 221A, 221B, 222, 224
- 21051001 Visual Arts Room 213B Renovation
- 21053002 CREOL Vinyl Floor Replacement Room 180C
- 21079001 Classroom Building 1 First Floor Carpet Replacement
- 21088003 Recreation and Wellness Center Climbing Tower Flooring Replacement
- 21088004 RWC Personal Training Office Track Flooring
- 21012001 Mathematical Sciences Carpet Replacement Phase 2
- 21123005 Trevor Colbourn Hall Suite 133 Support Furniture Modifications.pdf
- 21811101 Partnership I Carpet Replacement
- 21815001 Interior Build-out for Limbitless Solutions
- 21813001 Bennett Building 4 Room 174 IR Glare Addition of Modular Workroom
- 21915005 DPAC Room 304 Door Addition; Room 325 Electrical Upgrade
- UCF-575A Partnership IV Phase II
Other
Plumbing
- 20024002 Creative School Plumbing Repairs
- 21052003 Student Union Install Bidet Attachments in Pegasus Ballroom Restrooms
- 21120003 Research I Room 379 Compressed Air Plumbing and Access
- 21127002 Student Health Center Hot Water System Assessment and Repair
Research
- 15004002 Renovation of Former Electric Room for the Installation of Water Flume for Research
- 15040001 Engineering Classroom 387 to Lab Conversion
- 15051003 VAB Power for 6 Kilns
- 16044001 Siemens Energy Water Pump Install
- 20091002 Engineering II Infrastructure Upgrade for CNC Machine & 3D Printer
- 20105003 Lake Nona Cancer Center Exterior Staircase Addition
- 20121003 PSB 421 Laser Lab Modifications
- 21088005 Rec & Wellness Center Paving to Install Hydroponic Gardens
- 21121001 Physical Sciences Install Helium Recovery System
Roads / Parking / Sidewalks
- 19CMP002 Install Transit Kiosks at Bus Shelters
- 19950002 Flying Horse Courtyard
- 21022001 Print Shop Parking Lot Addition
- 21088002 RWC Outdoor Basketball Court Sidewalk
- 21097001 Parking Garage D Repair for a Busted Welding Plate
- 21903003 Rosen College Installation of Bus Stop Seating
- 21915006 Downtown Campus Asphalt Stamping Between DPAC and CMB
Roof Repair / Replacement
- 13021010 Education Building Roof Replacement
- 18008001 Reroof Volusia Hall
- 18026005 JT Washington Center Roof Replacement
- 18075005 Nicholson School of Communication & Media Replace Roof
- 19006003 Theatre Roof Replacement, Fall Protection, and Exhaust Fan Replacement
- 19009001 Lake Hall Roof Replacement
- 19019002 Rehearsal Hall Roof Replacement
- 19079004 Classroom Building I Replace Roof
- 19906006 Communication and Media Building Replace a Portion of Roof
- 20045008 Business Admin 1 Roof Replacement
- 20409001 Alpha Epsilon Phi Roof Replacement
Tech Fee
- 15013001 Technology Commons I Tech Fee
- 17012006 Mathematical Sciences Rooms 240, 241, & 242 Tech Fee Multimedia Upgrade
- 18005001 Chemistry Building Tech Fee
- 18012005 Multimendia Upgrades to MSB 121 and 336
- 18021001 (1819-32) Education- 174- Upgrade Multimedia
- 18012004 Math Sciences Tech Fee
- 18075001 Refresh NSC 172
- 19012004 Mathematical Sciences Rooms 405, 406, & 407 Tech Fee Classroom Upgrades
- 19019001 B0019 PAC Rehearsal Hall Room 116 Upgrade Multimedia (1819-36)
- 19021005 Educational Complex Tech Fee Rooms 174 and 175 Kinesiology Upgrade
- 19093002 Teaching Academy Room 303 Multimedia Upgrades
- 19119001 Upgrade Multimedia in Performing Arts Center Room T-101
- 19123002 (1819-77) TCH- 202- Upgrade Multimedia
- 19123014 Trevor Colbourn Hall Room 335 Upgrade Multimedia Classroom Buildout
- 21075001 Nicholson School of Communication Media Electrical Upgrades for Comm Rooms (TF1920-05)
Utility
- 18ZN4001 Construct New Cell Tower and Building for DAS
- 19143002 DEP IV Evaporative Colling Reclaimed Water Conversion
- 20915001 Donor Plaza Fountain DPAC
- 20CWP001 Installation of Combined Inlet Wells Meter
- 20CWP002 Potable Water Infrastructure Improvements
- 20CWP003 Campus Wide Installation of Permanent Bacteriological Sampling Stations
- 21CWP002 Distribution Chilled Water and Water Valve Replacement and Repair