Selection Results
Shortlist Results
Final Results
- Final Results – Industrial Rotating Equipment (Motors & Pumps)
- Final Results – Wastewater Continuing Services
- Final Results – Building Envelope Continuing Services
- Final Results – UCF-597 Biological Sciences Renovation CM
- Mechanical Contractor – Continuing Service $4M
- General Contractor – Construction Management $4M Continuing Service
- UCF-597 Biological Sciences Renovation
- Architect
- Industrial and Mechanical Wet Piping
- Utility Metering
- Medium Voltage Electrical Services and Control Circuitry $2M
- Fire Alarm
- Tree Care Contractor Continuing Services
- Structural Engineering Services
- Roofing Contractor Continuing Services
- Electrical Contractor Continuing Services
- Threshold Inspection Services
- GC $500K Continuing Services
- Roth Athletic Center (WD77) (Construction Manager)
- Commissioning Professional Services
- Test and Balance
- Emergency Response Contractor
Bid Results