Classroom Building 2 Stair Replacement

Start Date: February 2025
Target End Date: July 2025
Status: Site mobilization underway

 

PDC will be replacing all the paved steps around the exterior of Classroom Building 2.

 

The contractor will begin prepping the site for construction at the end of February. Work will begin on the red steps that open to Classroom Building 1 in early March. Existing ramps can be utilized to allow pedestrian access to the building.

 

Once replacement of the red steps is complete, work will begin on the white steps that open to Memory Mall. Existing ramps can be utilized to allow pedestrian access to the building.

 

The entire project is expected to be completed in July, however, construction timelines are subject to change.

 

The stairs and their surrounding areas will be closed during their respective phases of construction. Please adhere to all signage as you move throughout the building. Thank you for your patience during this project.

 